Putauaki Trust Industrial Subdivision Development Stage 2

Putauaki Trust

Scope of Works

  • Installation of Environmental controls and maintenance throughout works.
  • Close liaison with utility providers for relocations and installation of new infrastructure.
  • Removal of farm fences, existing drainage structures, traffic signs
  • Removal of large trees adjacent SH34 and Kiwi Rail yard
  • Earthworks including topsoil stripping and stockpiling for later re-use, cut to fill, cut to stockpile/fill and associated compaction testing.
  • Installation of Stormwater, watermains and wastewater reticulation systems.
  • Road construction woks including Subgrade improvement, Gap65 subbasecourse, NZTA B/6 cement stabilised subbase, M/4 basecourse, first coat sealing, deep lift asphalt, asphalt surfacing and the installation of traffic services.
  • Relocate existing and new guardrail
  • Construction of 20MPa concrete roundabout and associated kerb aprons on State Highway 34.
  • Construction of concrete splitter islands, kerb, channel, footpaths.
  • Landscaping.

 

Quick Facts

  • Contract Value: $3.6M
  • Location: 407 Tamarangi Drive (SH34 Kawerau)
  • Duration: September 2020 to August 2021
  • Completed within agreed timeframe and within budget